Last Week BP Owned and Transocean Operated Deep Horizons oil well blew and now we have a ecological disaster about to ruin the Gulf Of Mexico Beaches in La, Ms, Al & NW Florida a few weeks ago it was the Iceland Volcano now this mess I would like to here what members have to say about this.
Today I received and email and here is a copy of it listed bellow.
I got this from someone else but at least it is more detailed speculation >>>
TALKED TO MY ***, HE IS AT HOME NOW, AND IN GOOD SHAPE, WHAT I WAS TOLD WAS THEY HAD SET A 9-5/8 TAPERED PRODUCTION LINER, DID THEIR CEMENT JOB, HAD POSITIVE TESTED, AND ALSO NEGITIVE TESTED, THEY WERE GOING TO SET A BALANCED PLUG AROUND 3000' BELOW THE WELL HEAD WHICH WOULD BE AT ABOUT 8000', THE SENIOR COMPANY MAN WANTED TO SET THE BALANCED PLUG IN MUD, BUT THE ENGINEERS WANTED TO DISPLACE WITH WATER PRIOR TO SETTING
BALANCED PLUG, SO THEY DISPLACED FROM 3000' BELOW MUD LINE, AND WERE
GETTING READY TO SET PLUG. THE DERRICKMAN CALLED THE DRILLER AND SAID
HE NEEDED HELP, HE HAD MUD GOING EVERYWHERE, AND ABOUT THIS TIME THE
DRILL FLOOR DISAPEARED, THEN THERE WAS AN EXPLOSION, THEN A SECOND
EXPLOSION.
THE FLAMES ARE NOW GOING STRAIGHT UP ALLOWING EVACUATION OF MEN, THEN
YOU KNOW THE REST.
THE HANDS THAT ARE MISSING ARE THE ONES THAT WERE ON THE DRILL FLOOR
AND PUMP ROOM. YOU KNOW THE RESULTS OF THAT. THIS ALL TOOK PLACE IN
LESS THAN A MINUTE.
RIG WAS EVACUATED IN ABOUT 25 MINUTES.
IT IS BELIVED THAT THE SEAL ASSEMBLY AT THE WELL HEAD GAVE UP. IF THAT
IS THE CASE AND THEY WOULD HAVE SET THE BALANCED PLUG IN MUD THEN
DISPLACED THE RISER, IT WOULD ONLY HAVE DELAYED WHAT HAPPENED BY A
COUPLE OF HOURS.
GAS MUST HAVE CHANNELLED THROUGH THE CEMENT JOB AND UP THE BACK SIDE OF
THE 9-5/8 PRODUCTION CASING.
Today I received and email and here is a copy of it listed bellow.
I got this from someone else but at least it is more detailed speculation >>>
TALKED TO MY ***, HE IS AT HOME NOW, AND IN GOOD SHAPE, WHAT I WAS TOLD WAS THEY HAD SET A 9-5/8 TAPERED PRODUCTION LINER, DID THEIR CEMENT JOB, HAD POSITIVE TESTED, AND ALSO NEGITIVE TESTED, THEY WERE GOING TO SET A BALANCED PLUG AROUND 3000' BELOW THE WELL HEAD WHICH WOULD BE AT ABOUT 8000', THE SENIOR COMPANY MAN WANTED TO SET THE BALANCED PLUG IN MUD, BUT THE ENGINEERS WANTED TO DISPLACE WITH WATER PRIOR TO SETTING
BALANCED PLUG, SO THEY DISPLACED FROM 3000' BELOW MUD LINE, AND WERE
GETTING READY TO SET PLUG. THE DERRICKMAN CALLED THE DRILLER AND SAID
HE NEEDED HELP, HE HAD MUD GOING EVERYWHERE, AND ABOUT THIS TIME THE
DRILL FLOOR DISAPEARED, THEN THERE WAS AN EXPLOSION, THEN A SECOND
EXPLOSION.
THE FLAMES ARE NOW GOING STRAIGHT UP ALLOWING EVACUATION OF MEN, THEN
YOU KNOW THE REST.
THE HANDS THAT ARE MISSING ARE THE ONES THAT WERE ON THE DRILL FLOOR
AND PUMP ROOM. YOU KNOW THE RESULTS OF THAT. THIS ALL TOOK PLACE IN
LESS THAN A MINUTE.
RIG WAS EVACUATED IN ABOUT 25 MINUTES.
IT IS BELIVED THAT THE SEAL ASSEMBLY AT THE WELL HEAD GAVE UP. IF THAT
IS THE CASE AND THEY WOULD HAVE SET THE BALANCED PLUG IN MUD THEN
DISPLACED THE RISER, IT WOULD ONLY HAVE DELAYED WHAT HAPPENED BY A
COUPLE OF HOURS.
GAS MUST HAVE CHANNELLED THROUGH THE CEMENT JOB AND UP THE BACK SIDE OF
THE 9-5/8 PRODUCTION CASING.